Prioritization Of Plants In The Choghart Iron Ore Mine Reclamation Project By Promethee Method And Comparison With The Results Of The Fuzzy Topsis Method (Case Study: Choghart Iron Ore Mine) | Revista Publicando
Prioritization Of Plants In The Choghart Iron Ore Mine Reclamation Project By Promethee Method And Comparison With The Results Of The Fuzzy Topsis Method (Case Study: Choghart Iron Ore Mine)
PDF (EN)

Palabras clave

TIC
aprendizaje significativo
proceso enseñanza – aprendizaje
tecnología
comunicación
información

Cómo citar

A., I., M., & H. (2018). Prioritization Of Plants In The Choghart Iron Ore Mine Reclamation Project By Promethee Method And Comparison With The Results Of The Fuzzy Topsis Method (Case Study: Choghart Iron Ore Mine). Revista Publicando, 5(14 (2), 640-663. Recuperado a partir de https://revistapublicando.org/revista/index.php/crv/article/view/1192

Resumen

Mining operations as an activity play a role in environmental changes, which by utilizing new technologies, it is possible to decrease and minimize the environmental damage, while exploiting them principally. The reclamation of the mine is the most important plan to restore the mined land to the original state, and then to restore the area in different ways. When a case study was conducted in Choghart iron ore mine, the species were selected according to the suitability with initial factors of the reclamation plan including the type of mined land reuse, the climatic conditions, and the nature of the soil. Then, the secondary factors (criteria) were determined, and the decision matrices were obtained based on the questionnaires completed by the experts, and the plant species were prioritized based on the regional spectacle criteria, resistance against disease and insects, power and growth, access to plant species, economic efficiency, soil conservation and water supply and prevention of various types of pollution, by multi-criteria decision-making methods. It should be noted that the weights of the criteria are compared by Fuzzy AHP method and general prioritization of the options by PROMETHEE and Fuzzy TOPSIS methods. The most suitable plant species in the mining range and tailings dam obtained in order of priority in PROMETHEE method are tamarisk (0.78), palm (0.11), eucalyptus (0.04) and pine (0.85), respectively
PDF (EN)

Citas

Akbari, A.D., Osanloo, M., H. Hamidian., 2007. Selecting post mining land use through analytical hierarchy processing method: case study in Sungun copper open pit mine of Iran.

Alavi, I., Alinejad, R.H., Sadegh zadeh, M., 2011. Prioritizing Crescive Plant Species in Choghart Iron Mine Desert Region (Used method: Fuzzy AHP). Australian Journal of Basic and Applied Sciences, 5(12), pp.1075-1078.

Albadavi, A., Chaharsooghi, S.K., Esfahanipour, A., 2007. Decision making in stock trading: An application of PROMETHEE. European. Journal of Operational Research, 177, pp. 673–683.

Alexander, M.J., 1996. The Effectiveness of Small-scale Irrigated Agriculture in the Reclamation of Mine Land Soils on the Jos Plateau of Nigeria. Land Degradation and Development, 7, pp. 77-85.

Bangian A.H., Osanloo. M., 2008. Multi Atribbute Decision Model for Plant Species Selection in Mine Reclamation Plans: Case STUDY SUNGUN COPPER MINE. Post-Mining, February 6-8, Nancy, France.

Behzadian, M., Kazemzadeh, R.B., Albadvi, A., Aghdasi, M., 2009. PROMETHEE: A comprehensive literature review on methodologies and applications. European Journal of Operational Research, 200(1), pp. 198-215.

Belsky, A.J., Canham, C.D., 1994. Forest gaps and isolated savanna trees, An application of patch dynamics in two ecosystems. Bioscience, 44, pp.77-84.

Bogdanovic, D., Nikolic, D., & Ilic, I., 2012. Mining method selection by integrated AHP and PROMETHEE method. Anais da Academia Brasileira de Ciíªncias, 84(1), pp.219-233.

Brans, J., Mareschal, B., 2005. PROMETHEE method cited at: Multiple Criteria Decision Analysis: State of the Art Surveys, Springer, NewYork.

Brans. J.P., Vincke. P. A., 1985. preference ranking organisation method: The PROMETHEE method for MCDM. Management Science, 31(6), pp.647–656.

Cairns J., 1982. Ecological Considerations in Reclaiming Surface Mined Lands. Minerals and the Environment, 1, p. 83-89.

Carrick, P.J., Kruger R., 2007. Restoring Degraded Landscapes in Lowland Namaqua-land: Lessons from the Mining Experience and from Regional Ecological Dynamics. Journal of Arid Environments, 32, pp. 52-67.

Chen, C.T., 2000. Extensions of the TOPSIS for Group Decision Making Under Fuzzy Environment. Fuzzy Sets Syst, 114, pp1–9.

Chou, T.Y., Lin, W.T., Lin, C.Y., Chou, W.C., Huang, P.H., 2004. Application of the PROMETHEE technique to determine depression outlet location and flow direction in DEM. Journal of Hydrology volume, 287, pp 49–61.

Halouani, N., Chabchoub, H., Martel, J.M., 2009. PROMETHEE-MD-2T method for project selection. European Journal of Operational Research, 195, pp. 841–849.

Haque, N., Peralta-Videa, J.R., Duarte-Gardea, M., Gardea-Torresdey. J.L., 2009. Differential effect of metals/metalloids on the growth and element uptake of mesquite plants obtained from plants grown at a copper mine tailing and commercial seeds. Bioresource Technology, 100, pp.6177–6182

Hwang, C.L., Yoon, K., 1981. Multiple Attributes Decision Making Methods and Applications. Springer, Berlin.

Kasmaee, S.; Gholamnejad, J.; Yarahmadi, A.; Mojtahedzadeh, H., 2010. Reserve estimation of the high phosphorous stockpile at the Choghart iron mine of Iran usinggeostatistical modeling. Mining Science and Technology, Department of Mining and Metallurgical Engineering, Yazd University,Yazd, Iran , 20 , pp.855–860.

Macharis, C., Springael, J., Brucker, K.D., Verbeke, A., 2007, PROMETHEE and AHP: The design of operational synergies in multicriteria analysis, Strengthening PROMETHEE with ideas of AHP. European Journal of Operational Research, 153, pp.307–317.

Mishra, A., Sharma, S.D., Khan, G.H., 2003. Improvement in physical and chemical properties of sodic soil by 3,6 and 9 years old plantation of Eucalyptus tereticornis. journal of Forest Ecology and Management, Article in press.

Mohaghar, A., Mostafavi, A., 2007. A Model for Selecting a Project Group Using Fuzzy Approach. Quarterly Journal of Modarres, 44(3).

Momeni, M., 2008. New Issues in Operations Research, University Press, Second Edition, pp. 187-231.

Niknafs, A., Moghaddam, N., Hosseini Nasab, S.M., Niknafs, A., 2010. Towards a Self Regulating Process of Pairwise Comparison in AHP. 2010 IEEE/WIC/ACM International Conference on Web Intelligence and Intelligent .

Osanloo, M., Parsaei M., 2004. Sarcheshmeh Copper Mine Reclamation. Proceeding of Safety Congress, Iran, pp. 316-325.

Omidi, M., Razavi, H., Mah Peykar, M.R., 2011. Selection of project team members based on PROMETHEE method effectiveness criteria. Quarterly Journal of Industrial Management Outlook, 1, pp. 113-134.

Pooya, A.R., Alavi Tabari, S. J., Sibuyeh, A., 2012. Choosing layout using the PSI-PROMETHEE hybrid approach. Third specialized production and operation management conference, Faculty of Management, University of Tehran.

Rasooli, B., 2004. Investigation on the effect of cultivars of Haloxylon, Atripex and tamarisk species on soil physicochemical properties. Master Thesis of Range management, Tarbiat Modarres University.

Redente, E. F.; Baker, D. A., 1996. Direct revegetation of mine tailings- A case study in Colorado. In Planning, Rehabilitation and Treatment of Disturbed Lands, Billings Symposium, pp. 183-191

Saaty,T.L., 1980. The Analytical Hierarchy Process. Planning, Priority;1980,RWS Publication.

Safari, H., Fagheyi, M.S., Ahangari, S.S., Fathi, M.R., 2012. Applying PROMETHEE Method based on Entropy Weight for Supplier Selection. Business management and strategy, 3(1), PP. 97-106.

Soltanmohammad, H., Osanloo, M., Rezaei, B., Aghajani Bazzazi, A., 2008. Achieving to some outranking relationships between post mining land uses through mined land suitability analysis. International Journal of Environmental Science and Technology, 5(4), pp.535-546.

Soltanmohammadi, H., Osanloo, M., Aghajani, AB., 2010. An analytical approach with a reliable logic and a ranking policy for post-mining land-use determination. Land Use Policy, 27, pp. 364–372

Taherkhani, M., 2007. Application of TOPSIS Technique in Spatial Prioritization of Establishment of Agricultural Conversion Industries in Rural Areas. Quarterly Journal of Economic Research, 6 (3), pp. 59-73.

Tavili. A., 2010. Investigating the Effect of tamarisk, Haloxylon and Seidlitzia rosmarinus Species on Soil in the Chah-Afzal Area of Yazd. Iran Forest Journal, 2 (4), pp. 357-365

Tafi, T.C., Neuman, D., Wraith, J., Fedock, J., 2006. Reclamation Effectiveness at Three Reclaimed Abandoned Mine Sites in Jefferson County, Montana. A Thesis Submit-ted in Partial Fulfillment of the Requirements for the Degree of Master of Science in Land Rehabilitation, Montana State University, Bozeman, Montana.

Xia, L., Zhen-qi, H., Wei-jie, L., Xiao-yan, H., 2007. Vegetation Growth Monitoring Under Coal Exploitation Stress by Remote Sensing in the Bulianta Coal Mining Area, Insitute of Land Reclamation and Ecological Restoration, China University of Mining & Technology, Beijing 100083, China, J China Univ Mining & Technol, 17(4), pp. 479 –483.

Zadeh, L.A., 1965. Fuzzy Sets. Inf Control, 8, pp. 338–353.

Zak, J., Sawicka, H., 2010. Application of MCDM/A Methods to Ranking Different Variants of the Distribution System. 12th WCTR, Lisbon, Portugal, July 11-15.

Descargas

La descarga de datos todavía no está disponible.